Skip to Content
  • Delivery in 4–10 working days across Saudi Arabia
  • A tax invoice with every order
  • Technical support before and after you buy

Reyee RG-ES118GS-P-L 18-Port Gigabit Unmanaged PoE Switch, 16 x PoE+, 2 SFP, 247 W

Part number RG-ES118GS-P-L
  • 16-port 10/100/1000 Mbps unmanaged PoE switch with 2 SFP uplinks; 16 PoE+ ports, 247 W PoE budget
  • Unmanaged switch, visible on Ruijie Cloud (requires at least one managed switch on the same network)
  • Intelligent and secure CCTV network with PoE auto recovery (PoE watchdog)
  • Flexible Extend mode for long-distance transmission to cameras
  • Intelligent PoE management: fits various powered devices up to 30 W per port
  • DIP switch with port isolation mode for higher security
  • High-quality design adhering to strict standards in PCB design and component selection
  • Plug and play, energy saving, 3-year warranty
Price
⃁ 916.50 ⃁ 916.50 ⃁ 1,193.36 Save 23%
⃁ 916.50 ⃁ 1,193.36
(Tax excluded)
  • Delivery within 4–10 business days across Saudi Arabia
  • Warranty according to the manufacturer
  • Tax invoice with every order
  • Technical support before and after purchase

Not sure this model fits your setup? Read the buying guide

Overview of Reyee RG-ES118GS-P-L

The Reyee RG-ES118GS-P-L is a 16-port 10/100/1000 Mbps unmanaged PoE switch with two Gigabit SFP uplinks for fiber connections. Its 16 IEEE 802.3af/at PoE/PoE+ ports share a 247 W budget, enough for larger IP camera deployments in warehouses, retail stores, schools and office buildings. A DIP switch offers Default, Extend (up to 200 m at 10 Mbps on ports 1-8) and Isolation modes, and PoE watchdog automatically recovers frozen devices. The metal rack-mount chassis uses two fans with automatic speed adjustment, supports 10000-byte jumbo frames and is visible on Ruijie Cloud when a managed Reyee switch is on the same network.

Technical Specifications – Reyee RG-ES118GS-P-L

Product Information

Product CategoryLayer 2
Warranty3 years

Port Specifications

Total number of RJ45 ports16
Total number of optical ports2
Number of 1GE SFP ports2
Number of 10/100/1000BASE-T ports18
Ultra-long-haul transmissionYes
DIP switchExtend mode: The rate of Ports 1 to 8 is reduced to 10 Mbps, but the maximum transmission distance can be up to 200 meters (Cate5e cables required). Flow control on. Default mode: All ports can communicate with each other. Flow control on. Isolation mode: Ports 1 to 16 cannot communicate with each other, but they can communicate with ports 17 and 18. Flow control on.

Power Supply and Consumption

PoE Out standardPoE/PoE+ (IEEE 802.3af/at)
Number of PoE/PoE+ Out ports16
PoE budget247 W
PoE power pins1–2 (+), 3–6 (-)
Power input220 V AC power supply: Rated input voltage: 100 V AC to 240 V AC, 50 Hz to 60 Hz; Maximum input voltage: 90 V AC to 264 V AC, 47 Hz to 63 Hz; Rated input current: 4.5 A
Maximum power consumption20 W (with no PoE load); 267 W (with PoE full load)
Power supplyFixed power supply

System Specifications

Flash memory4 MB
Forwarding rate26.8 Mpps
Switching capacity36 Gbps

Dimensions and Weight

CasingMetal
Product dimensions (W x D x H)440 mm x 214.9 mm x 44 mm (17.32 in. x 8.46 in. x 1.73 in.)
Weight2.57 kg (5.67 lbs) (without packaging materials); 3.78 kg (8.33 lbs) (with packaging materials)
Shipping weight3.78 kg (8.33 lbs)

Environment and Reliability

Fan2 x fixed fan
CoolingAir cooling, front-to-rear airflow
Acoustic noise< 45 dB: 25℃ (77°F)
Mounting optionsRack
Hot swapping of cablesHot swapping supported by the service port and power connector
MTBF200,000 hours
Operating temperature0°C to 45°C (32°F to 113°F)
Storage temperature–40°C to +70°C (–40°F to +158°F)
Operating humidity10% RH to 90% RH (non-condensing)
Storage humidity5% RH to 95% RH (non-condensing)
Altitude–500 m to +5,000 m (–1,640.42 ft. to +16,404.20 ft.)
ESD protectionAir discharge: 8 kV; Contact discharge: 6 kV
Surge protectionService port: ± 4 kV for common mode; Power connector: ± 6 kV for common mode and ± 6 kV for differential mode

Certification and Regulatory Compliance

EMCEN 55032, EN IEC 61000-3-2, EN 61000-3-3, EN 55035, EN 300 386
Safety complianceEN 62368-1, IEC 62368-1
CertificationCE, CB

Basic Configurations

PoE watchdogYes

Ethernet Switching

Maximum number of MAC address entries8000
Interface flow controlYes
LLDPNo
LLDP-MEDNo

Interface

Jumbo frame length (MTU)10000 bytes

IP Service

IPv4 pingNo
IPv4 tracerouteNo
ICMPv6No
IPv6 pingNo
IPv6 tracerouteNo

Multicast

IGMPv1 snoopingNo
IGMPv2 snoopingNo
Basic IGMPv3 snoopingNo
Full IGMPv3 snoopingNo
IGMP filteringNo

Network Management and Monitoring

Fan speed adjustmentAutomatic speed adjustment

Security

Port isolationYes

System Performance Capacity

Recommended camera limit200W H265: 40; 400W H265: 20

Source: Ruijie Reyee official website and datasheet. Specifications are subject to change by the manufacturer.

PRACTICAL ANSWERS

Network planning questions

Should I choose a router, a switch or an access point?

Start with the task: connecting networks, adding wired device ports, or providing wireless coverage. A single installation may need more than one device type. Share a site diagram and device list so the proposed roles and connections are clear.

Why is wireless coverage weak in some rooms?

Check the access point location, building layout, obstacles and the number of active devices. Measure coverage where people actually work before choosing extra equipment; changing the internet package alone may not address a coverage problem.

How do I select a switch for powered network devices?

List the devices to be connected and check each device’s power requirements against the switch’s per-port capability and total documented power budget. Also review uplink capacity and reserve ports for the expansion you actually expect.

Can the guest network be separated from business devices?

Define which devices and services guests should be able to reach, then check whether the router, switch and access points support the required separation. Test the resulting access rules; a different wireless network name alone is not the acceptance test.

What information helps plan a network upgrade?

Provide floor plans, current equipment models, internet connections, cabling details and peak device counts. Describe the applications that matter most and the observed problem, such as disconnections or slow local file access.

How should network performance be checked after installation?

Agree on the locations and representative workloads to test, then record wired and wireless results separately. Check connectivity, coverage and access rules during normal use, and retain a diagram and configuration backup for support.