Skip to Content

Hikvision DS-3T0510P 8-Port Gigabit Unmanaged Industrial PoE Switch, 2 SFP, -40~75°C

  • Full gigabit port
  • The backplane bandwidth is 20 Gbps.
  • Supports PoE power supply and IEEE 802.3AF/AT standards.
  • The maximum output power of each PoE port is 30 W.
  • PoE management: PoE device detection and PoE power management
  • Adopt redundant dual power input design
  • Die cast aluminum alloy housing.
  • No fan, -40 °C to 75 °C operating ambient temperature.
  • MTBF ≥ 400,000 hours.
Price
⃁ 833.33 ⃁ 833.33 ⃁ 1,041.66
(Tax excluded)
  • Delivery within 2–5 business days across Saudi Arabia
  • Warranty according to the manufacturer
  • Tax invoice with every order
  • Technical support before and after purchase

Not sure this model fits your setup? Read the buying guide

Overview of Hikvision DS-3T0510P

The Hikvision DS-3T0510P is a full Gigabit unmanaged industrial PoE switch with eight Gigabit PoE ports and two Gigabit fiber optical ports. Each port delivers up to 30 W (IEEE 802.3af/at) within a 240 W PoE budget, with PoE device detection and power management, and 20 Gbps switching capacity. The die-cast aluminum, fan-free housing runs from -40 °C to 75 °C, accepts redundant dual power inputs and provides 6 kV surge protection, with an MTBF of at least 400,000 hours. It suits Saudi industrial plants, oil and gas sites, ports, warehouses and roadside cabinets.

Technical Specifications – Hikvision DS-3T0510P

General

ShellMetal material, fan-free design
Net Weight0.8 kg (1.76 lb)
Gross Weight1.3 kg (2.87 lb)
Dimensions (W × H × D)52.0 mm × 140.0 mm × 110.0 mm (2.05'' × 5.51'' × 4.33'')
Operating Temperature-40 °C to 75 °C (-40 °F to 167 °F)
Storage Temperature-40 °C to 85 °C (-40 °F to 185 °F)
Operating Humidity5% to 95% (no condensation)
Relative Humidity5% to 95% (no condensation)
Power Supply48VDC, 3.13A
Max. Power Consumption250 W
Power Consumption In Idle10 W
Installation ModeDesk-Mounted
Surge Protection6 KV

Network Parameters

Ports8 × Gigabit PoE port,2 × Gigabit fiber optical port
MAC Address Table4 K
Switching Capacity20 Gbps

PoE Power Supply

PoE StandardIEEE 802.3af,IEEE 802.3at
PoE Power PinEnd-span: 1/2(+), 3/6(-)
PoE PortPoE: Ports 1 to 8
Max. Port Power30 W
PoE Power Budget240 W

Approval

EMCFCC (47 CFR Part 15, Subpart B),CE-EMC (EN 55032: 2015+A11: 2020, EN IEC 61000-3-2: 2019, EN 61000-3-3: 2013+A1: 2019, EN 50130-4: 2011+A1: 2014, EN 55035: 2017+A11: 2020),IC (ICES-003: Issue 7:2020),RCM (AS/NZS CISPR 32: 2015)
SafetyUL (UL 60950-1),CB (AMD1:2009, AMD2:2013, IEC 62368-1: 2014 (Second Edition), CE-LVD (EN 62368-1: 2014+A11: 2017)
ChemistryCE-RoHS (2011/65/EU)

Source: Hikvision official website. Specifications are subject to change by the manufacturer.

PRACTICAL ANSWERS

Network planning questions

Should I choose a router, a switch or an access point?

Start with the task: connecting networks, adding wired device ports, or providing wireless coverage. A single installation may need more than one device type. Share a site diagram and device list so the proposed roles and connections are clear.

Why is wireless coverage weak in some rooms?

Check the access point location, building layout, obstacles and the number of active devices. Measure coverage where people actually work before choosing extra equipment; changing the internet package alone may not address a coverage problem.

How do I select a switch for powered network devices?

List the devices to be connected and check each device’s power requirements against the switch’s per-port capability and total documented power budget. Also review uplink capacity and reserve ports for the expansion you actually expect.

Can the guest network be separated from business devices?

Define which devices and services guests should be able to reach, then check whether the router, switch and access points support the required separation. Test the resulting access rules; a different wireless network name alone is not the acceptance test.

What information helps plan a network upgrade?

Provide floor plans, current equipment models, internet connections, cabling details and peak device counts. Describe the applications that matter most and the observed problem, such as disconnections or slow local file access.

How should network performance be checked after installation?

Agree on the locations and representative workloads to test, then record wired and wireless results separately. Check connectivity, coverage and access rules during normal use, and retain a diagram and configuration backup for support.