Turnstiles and speed gates control people's entry quickly, but a successful installation is decided before they arrive on site. In this guide the Rasid team explains what the building needs to have ready so installation goes ahead without extra breaking or delays.
1. Choosing the gate type
- Tripod turnstile: practical for factories and both external and internal entrances.
- Flap barrier: fast and neat for offices and administrative buildings.
- Swing barrier: a wider lane, suitable for wheelchair users and moving goods.
- Full-height turnstile: for outdoor sites that need higher security.
We choose the type by the number of people at peak time, the security level needed, whether the gates are indoors or outdoors, and the shape of the entrance itself, because the gate must suit the place, not the other way round.
2. Floor and level
Gates need a level, solid floor that holds anchor bolts firmly, because any slope affects how the flaps and arms move. If the floor is finished marble or tiles, mounting is possible but needs care; it is better to prepare the gate area before the final finish.
3. Underground conduits
Power and communication cables run between the gate units and need conduits or channels under the floor. We define their route and sizes on a drawing handed to the finishing team, along with a dedicated power point and a network point for each group of gates. We also leave access points so cables can be reached without removing the whole gate.
4. Lanes and dimensions
The number of lanes depends on how many people pass at peak time; an entrance everyone uses at the start of the day needs more lanes. We include a wide lane, usually at least 900 mm, for wheelchair users and trolleys, and leave enough space in front of the gates so people do not bunch up at the main door.
5. Fire evacuation
Gates are connected to the fire alarm signal so the flaps open or the arms drop automatically. Because gates alone may not be enough to evacuate many people quickly, we plan an emergency door next to them and review the building's civil defence requirements.
6. Readers and integration
Card readers or face terminals are fitted on the gates with dedicated brackets and linked to the access control system to log movements and stop two people passing on one card. We decide this early because it affects the conduits and the gate type.
Read our guide to access control readers and cards, and browse our access gates and barriers.
Checklist before installation day
- The floor at the gate area is ready and level.
- Conduits and channels are laid as per the drawing.
- Power and network points are ready.
- A safe route to move the heavy gate units into place.
Maintenance after installation
Gates are mechanical devices that run all day, so they need periodic checks of motors, sensors, flaps and readers. They can be included in an annual maintenance contract with the rest of the access control system.
Frequently asked questions
Can gates be installed on finished marble?
Yes, with suitable tools and anchors, but running the cables may need channels cut in the floor, which is why we recommend planning before the finish.
How do visitors without a card get through?
With a temporary visitor card, a QR code, or opening from reception, depending on how visitors are managed in the building.
Need installation or maintenance?
Rasid's team works out of Riyadh and travels for supply, installation, programming and maintenance in Riyadh, Dammam, Khobar, Jeddah and across the Eastern Province, with annual maintenance contracts for businesses and homes. Message us on WhatsApp +966559790746 or request a solution for your project.