A good surveillance system does not start with buying cameras; it starts with a proper survey and a clear plan. In this guide the Rasid team explains the stages of a CCTV project as we run them in Riyadh and when our team travels to Dammam, Khobar, Jeddah and the Eastern Province, so you know what to expect at each step.
1. Site survey and goals
We start with a visit and a clear question: what do you need to see? General coverage of a yard, faces at an entrance, or number plates at a gate? Each goal needs a different distance, angle and lens. During the survey we record camera positions, cable routes, the recorder location, the power source and the lighting at night.
2. Design and equipment
After the survey we set the number and type of cameras (bullet outdoors, dome indoors in most cases), their resolution and lens, the recorder channel count, disk capacity for the retention you need, and the PoE switches and their power budget. You receive an itemised quotation that shows every line.
3. Cabling
We run network cable inside suitable conduit or trunking, keep each copper run between switch and camera within 100 m, and use UV-resistant outdoor cable on exposed routes. Both ends of every cable are labelled so later maintenance is easy.
For the technical details, see our guide to CCTV cabling and PoE.
4. Mounting
- Fix cameras on brackets suited to the wall, corner or pole.
- Use waterproof junction boxes to protect outdoor connections.
- Install the recorder and switches in a ventilated rack away from heat and dust.
- Feed the rack from protected power, ideally with a UPS for outages.
5. Programming and tuning
We set the angle and focus of every camera, programme the recorder with the recording schedule and motion or smart events, replace default passwords, update firmware and set up mobile viewing with a separate account per user.
6. Testing and handover
Before handover we test the picture by day and night, confirm recording, playback and search, and check the real retention on the disks. You receive the camera layout, passwords and a short training on how to find and export recordings.
7. After handover
A system needs follow-up: lens cleaning, disk health checks and firmware updates. That is why we offer annual maintenance contracts with periodic visits and a full inspection.
What we need from you before we start
- Building drawings if available, or access for a full walk-round.
- Access to false ceilings, the roof and electrical rooms.
- A suitable power point for the rack, and an internet line if remote viewing is needed.
- One contact person on site for coordination and decisions.
Working in an occupied building
In shops, offices and warehouses that stay open we plan around working hours so business is not disrupted: busy areas are cabled outside peak times, furniture and displays are covered when drilling, and the work area is cleaned every day. When an old system is being replaced we keep it running until the new one is ready wherever possible, so the premises are never left unmonitored.
See our preventive CCTV maintenance checklist.
And browse our security cameras section.
Frequently asked questions
How long does a CCTV installation take?
It depends on the number of cameras, the cable runs and the site. We set the duration after the survey and state it in the quotation.
Do you work outside Riyadh?
Yes. Our team travels from Riyadh to deliver projects in Dammam, Khobar, Jeddah and the Eastern Province.
Need installation or maintenance?
Rasid's team works out of Riyadh and travels for supply, installation, programming and maintenance in Riyadh, Dammam, Khobar, Jeddah and across the Eastern Province, with annual maintenance contracts for businesses and homes. Message us on WhatsApp +966559790746 or request a solution for your project.