Setting Up a Network Cabinet with a Delta DIN Rail Power Supply

Setting up a control cabinet for network and surveillance gear with the Delta DRL-48V240W1EN: planning, rail mounting, wiring, heat and a pre-start checklist.

Table of contents

No titles in the blog post

In factories, warehouses and outdoor sites, network and surveillance equipment is gathered in a small control cabinet: an industrial switch, a power supply, breakers and terminals. The Delta DRL-48V240W1EN is built for DIN rail mounting inside such cabinets. This guide gives practical steps for setting the cabinet up safely and neatly.

1. Planning the cabinet

  • Draw a layout showing the order on the rail: breakers, then the supply, then distribution terminals, then the switch.
  • Leave space above and below the supply for ventilation, following the manufacturer's instructions.
  • Keep AC power wiring apart from network and signal cables.
  • Choose a cabinet large enough for future additions.

2. Mounting on the rail

Fix a standard DIN rail in the cabinet, then hook the supply onto it from the top and press it home until it clips in. Make sure the ventilation openings on the supply are not covered by wires or trunking.

3. Wiring

  1. Isolate the cabinet before you start.
  2. Fit a suitable breaker ahead of the supply input, and connect the earth to the earth terminal.
  3. Take the 48 V output to distribution terminals and from there to the switch and devices, observing polarity.
  4. Use wire sized for 5 A, and insulated ferrules on stranded wire ends.
  5. Label every wire and terminal to make maintenance easier.

4. Heat inside the cabinet

In summer sun, a cabinet can get far hotter than the outside air. The supply is rated up to 70 °C on its page, but the switch and other devices may have a lower limit. So:

  • Choose a light-coloured cabinet and mount it in the shade where possible.
  • Add filtered fans or a small cooling unit for larger cabinets.
  • Place the supply low in the cabinet or away from heat-sensitive devices, since hot air rises.

Power the supply up with no load first, measure the voltage at the distribution terminals, then connect the switch.

5. Pre-start checklist

  • Polarity is correct on every terminal.
  • The earth is connected.
  • No bare or strained wires.
  • Ventilation openings are clear.
  • Breakers are labelled.

6. Routine maintenance

  • Check terminal screws for tightness after the first month, then once or twice a year.
  • Clean the fan filters and any dust inside the cabinet.
  • Measure the output voltage under load at midday in summer.
  • Update the layout drawing whenever you add a device.

For the supply specification, see our guide to the DRL-48V240W1EN.

To size the power you need, see our guide to sizing a 48 V power supply.

The product in this guide

Frequently asked questions

Does the supply need space around it?

Yes, leave ventilation space above and below it as the manufacturer instructs, and do not cover its openings.

Can the cabinet be installed outdoors?

Yes, in an outdoor-rated cabinet protected from sun and dust, bearing in mind the supply is rated up to 70 °C.

How do I know the supply is working properly?

Measure the voltage at the distribution terminals: it should be close to 48 V, within the ±1.0% accuracy on its page, and keep an eye on the supply and switch temperatures.

Which breaker should I use?

It depends on the input current and the manufacturer's instructions; Rasid's team sets it when designing the cabinet.