Installing a Network Cabinet: Cables, Power and Earthing

Installing an Avayo cabinet: choosing the spot, fixing a wall cabinet or leveling a floor one, arranging devices, managing cables, PDU power and earthing.

Table of contents

No titles in the blog post

A good cabinet can turn into a mess if it is installed without a plan: tangled cables, devices that are hard to remove and high temperatures. This guide sets out practical steps for installing Avayo cabinets, from choosing the spot to power distribution and earthing, so the cabinet stays tidy and easy to maintain for years.

1. Choose the spot

  • An air-conditioned, dry room away from water and direct sun, since the cabinets are rated IP20 for indoor use only.
  • Space in front of and behind the cabinet to open the doors and reach the equipment.
  • Close to a suitable power source, with a clear cable route from the ceiling or floor.

2. Fixing it in place

A wall cabinet is fixed to a concrete or block wall with anchors suited to its weight with the equipment, and its load must not exceed 30 kg. A floor cabinet arrives on heavy-duty castors with stoppers; roll it into place, then lower the four leveling feet until it stands level and no longer rests on the castors.

3. Arrange devices from the bottom up

  • Heaviest at the bottom: the UPS and batteries, then servers and recorders.
  • Switches and patch panels near the cable entry, with a cable manager between each patch panel and switch.
  • Use a shelf for devices not designed for rack mounting, such as a small router.
  • Set the depth of the front and rear 19-inch profiles to suit the devices before mounting them; they are adjustable.

4. Cable management

  • Bring cables in through the top or bottom openings, and keep power cables apart from data cables as far as possible.
  • Use patch cords of the right length instead of coiling long cables inside the cabinet.
  • Label every cable at both ends and keep a port map with the cabinet.
  • Do not bend network or fiber optic cables at sharp angles.

5. Power and earthing

Every floor cabinet and the 18U wall cabinet come with a PDU to distribute power to the equipment. Feed the PDU from a UPS or a dedicated circuit, do not load it beyond its rating, and split devices with dual power supplies across two sources where available. Bond the cabinet frame to earth; this protects the equipment and technicians and reduces interference.

Floor cabinets have quick-release lockable side panels; lock them after installation and keep the keys with the network administrator.

To apply these steps to a CCTV system, see our guide to a CCTV system cabinet.

Products mentioned in this guide

Frequently asked questions

How do I stop a floor cabinet from moving?

Once it is in place, lower the four leveling feet, and use the castor stoppers while moving it.

Do wall cabinets come with a PDU?

Only the 18U W18SS; the other wall cabinets come with a fan and a shelf.

Where do the cables enter?

From the top and bottom on every model.

Need help choosing the right Avayo solution?

Rasid's team in Riyadh helps you choose the right equipment for your site and handles supply, installation and programming for businesses, hotels and homes in Saudi Arabia. Message us on WhatsApp +966559790746 or request a solution for your project.