Skip to Content
  • Delivery in 4–10 working days across Saudi Arabia
  • A tax invoice with every order
  • Technical support before and after you buy

Installing Vehicle Barrier Gates: Foundation, Sensors and Safety

How the Rasid team installs vehicle barriers: survey, boom length, concrete base, ground loops, photocells, opening methods and safety tests.

Table of contents

No titles in the blog post

A vehicle barrier looks simple, but a poor installation can make the boom hit a car or fail again and again. In this guide the Rasid team explains the stages of installing a barrier as we apply them at company entrances, compounds and car parks.

1. Survey and choosing the barrier

We measure the lane width to set the boom length and ask how many openings are expected per day, because a barrier built for intensive use differs from one for light use. We also note the power source, the ground type, whether there is a pedestrian path and the opening method required, and check the ground slope and rainwater drainage so water does not collect around the base.

2. Foundation and conduits

The barrier sits on a level concrete base built to the manufacturer's dimensions, with suitable anchor bolts. Before pouring the concrete we lay the conduits for power, control and ground loop cables, because adding them later means breaking the concrete.

3. Boom and balance

The boom length follows the lane width, and the balance spring is set for that length plus any extras such as lights or a skirt, since an unbalanced boom strains the motor and shortens its life. Where the ceiling is low we use an articulated boom that folds while opening.

4. Safety sensors

  • A ground loop under the boom that stops it coming down while a car is over it.
  • A pair of photocells facing each other to detect any obstacle in the lane.
  • An anti-fall radar at entrances used by pedestrians or bikes.
  • An extra loop for automatic closing after the car passes, where needed.

5. Opening methods

The barrier can open by remote control, card reader, number plate camera, a button in the guard room, or from the access control system through a dry contact. We choose the method by type of user, whether staff, residents or visitors, and may combine several methods at the same entrance.

6. Programming and testing

We set the open and close limits, speed and auto-close timer, then test with real cars: opening, closing, the boom stopping when a car is under it, and the photocells. We show how to open by hand during a power cut, paint the stop line and advise on signage.

7. Handover and training

You receive the remote controls already registered and a list of users and cards, with a walk-through on adding a new remote, cancelling a lost one and opening by hand. We also hand over the saved settings so they are easy to restore during maintenance.

What we need from you before installation

  • A power point near the barrier position.
  • Approval for digging and concrete work in the lane.
  • Your choice of opening methods and the number of users and remotes.
  • Traffic arrangements while we work at the entrance.

After installation, see parking barrier maintenance, and browse our access gates and barriers.

Frequently asked questions

Can the barrier work with a number plate camera?

Yes. The camera opens the barrier through a contact output when it recognises a plate on the list, and it can be linked to the access control system to log movements.

What happens during a power cut?

The barrier can be opened by hand with its release key, and some models support a backup battery that keeps them running for a while. We explain the right option during the survey.

Need installation or maintenance?

Rasid's team works out of Riyadh and travels for supply, installation, programming and maintenance in Riyadh, Dammam, Khobar, Jeddah and across the Eastern Province, with annual maintenance contracts for businesses and homes. Message us on WhatsApp +966559790746 or request a solution for your project.